"How long will my roof replacement take?" is one of the first questions Connecticut homeowners ask us. The short answer: most Roof Next jobs are done in a single day. Let's walk through the complete timeline.
What Happens on Roof Replacement Day in Connecticut
7:00 AM โ Crew Arrives
Roof Next crews arrive at the agreed start time. Tarps are laid across all landscaping, driveways, and deck areas to catch debris.
7:30 AM โ Tear-Off Begins
Old shingles and underlayment are stripped. We inspect the exposed decking for soft spots, rot, or damaged areas. We notify you immediately if we find additional work needed.
9:00โ10:00 AM โ Deck Repairs (if needed)
Any damaged sheathing is replaced. We show you before and after if there are repairs.
10:00 AM โ 12:00 PM โ Underlayment & Ice & Water Shield
Ice & water shield goes down at eaves and valleys first. Synthetic underlayment covers the rest of the field.
12:00โ4:00 PM โ Shingle Installation
Starter strips, field shingles, hip and ridge cap installed in sequence. Flashing around chimneys, vents, and dormers is installed or replaced.
4:00โ5:00 PM โ Cleanup
Debris is loaded and removed. Magnetic sweeps cover the entire property. All tarps removed. Gutters cleaned of debris.
5:00โ5:30 PM โ Final Walkthrough
We walk the finished roof with you and provide all warranty documentation before leaving.
Total time: 1 day for most Connecticut homes (1,500โ3,000 sq ft). Larger or more complex roofs may extend to 1.5โ2 days.
Roof Next crews arrive at the agreed start time. Tarps are laid across all landscaping, driveways, and deck areas to catch debris.
7:30 AM โ Tear-Off Begins
Old shingles and underlayment are stripped. We inspect the exposed decking for soft spots, rot, or damaged areas. We notify you immediately if we find additional work needed.
9:00โ10:00 AM โ Deck Repairs (if needed)
Any damaged sheathing is replaced. We show you before and after if there are repairs.
10:00 AM โ 12:00 PM โ Underlayment & Ice & Water Shield
Ice & water shield goes down at eaves and valleys first. Synthetic underlayment covers the rest of the field.
12:00โ4:00 PM โ Shingle Installation
Starter strips, field shingles, hip and ridge cap installed in sequence. Flashing around chimneys, vents, and dormers is installed or replaced.
4:00โ5:00 PM โ Cleanup
Debris is loaded and removed. Magnetic sweeps cover the entire property. All tarps removed. Gutters cleaned of debris.
5:00โ5:30 PM โ Final Walkthrough
We walk the finished roof with you and provide all warranty documentation before leaving.
Total time: 1 day for most Connecticut homes (1,500โ3,000 sq ft). Larger or more complex roofs may extend to 1.5โ2 days.
Ready to Get Started? We Can Inspect This Week
Roof Next schedules free inspections quickly across all Connecticut โ often same-week. Get your inspection scheduled and your replacement done in as little as 2 weeks from today.